    Updates- August 29, 2018 
    One year ago today we received a photo taken from FM 2100 showing our fields, parking lots and buildings completely flooded.  Fish swam in our parking lot!  Through prayer and the gifts of time, talents and strength, we have come a long way!  We have rebuilt and remodeled the office buildings, we have rebuilt the Christian Fellowship Center, we have created a wing for Children's Ministry and we have started Rising from the Water, a capital campaign to build a new Sanctuary!  Praise the Lord!


    Updates- August 3, 2018 
    Trustees Committee – Ad Council update

    Reconstruction update

    Office building repairs are complete!   Big thank you out to the Trustees and the church staff who endured the dust, noise and traffic AND most of all to the decorating committee.  Cassandra and Christen….they made all the tough decisions on paint colors, flooring, doors and wall hangings! 

    Here’s a summary of the repair costs

                CFC - $40K

                Office Building – $90K

    Again big thanks to all the church members who helped with the demolition, clean up and dry out.  The Servco estimate was $100K.   With all the labor being our own we spent <$1000 on demo!

    Trustees Worklist

    With major construction complete the Trustees focus turns to routine maintenance and improvements.  See attached work list below and let me know of any questions.

    New Sanctuary update

     The building committee/Trustees sub team (aka Architectural team) has met with our pro-bono Architect Wes Duncan.  Wes is Associate Pastor at Humble United Methodist Church and a degreed Architect who has designed many church structures.  Working with Wes we have a couple options that we are developing. 

    Key concepts

    • Located on original sanctuary location (maintain east wall location, expand in all other directions for necessary sq ft)
    • Elevate slab 1-2ft.
    • Seating for 250+ (chairs not pews)
    • Connective social gathering space outside of sanctuary
    • Attractive exterior façade with prominent entrance
    • Permanent stage and sound booth
    • Add ADA restroom or restrooms
    • Maintain connection to existing building
    • Modify existing kitchen location
    • Expand parking lot (sanctuary will take some of existing plus we’ll need more)

    We have 2 options we’re close to finalizing. 

    • 6000 Sq Ft with new womens and mens ADA restrooms, large gathering space, sanctuary with 250 seat capacity
    • 5000 Sq Ft with single unisex ADA restroom, reduced gathering space and 5ft narrower sanctuary

    Architect tells us we should expect to spend between $130-$150 per Sq Ft.  (the range is based on choices we make in décor, flooring, fixtures, audio/visual systems)

    • 6000 Sq Ft:   $780K - $1.2mln
    • 5000 Sq Ft:   $650K- $975K

    From a potential funding stand point we have

                $130K remaining from land sale

                $130K Moody Methodist promissory matching grant

                $500K capital campaign feasibility (over 3yr term)           

                $760K

    No matter what choice we make a construction loan will be required.  Depending on option selected we may have a remaining loan note.  (Methodist conference recommends max loan of 25% of annual donations….~$100K)

    Architect has recommended a commercial builder that he’s worked with on other projects.  As we finalize floor plan and meet with builder we will firm up these figures.

    Wes also recommends we partner with the builder early and use them for development of civil, sewer, power plans and finishing details.  His experience is that’s more cost effective than to have an architectural firm produce every detail and go out for bids to builders. His experience is that the change order process wipes out any perceived savings from competitive bidding.  Wes discussed this approach with the district supt and Moody Methodist and they concur.  At the meeting I will ask for Ad Council approval to take this partnership approach.

    Sanctuary Clean out

    Lots of stuff still stored in the Sanctuary.  It will have to be empty by Dec 1.

    Request – Church staff and leaders inspect items that are in there and if it will be kept move it or ask me and I’ll have it moved.

    Tools – that are lots of tools that were left by people helping with demolition.  We need owner to claim their items by Sept 15.  After that trustees will determine what to do with those items.  (UM Army, Trustees tool locker, garage sale)

     

    Thank You,

    Brett McGregor , for Trustees Committee


     

    Updates- May 2018 

    May 15, 2018 - Charge Conference was held and it was voted unanimously to approve a resolution to begin the Capital Campaign with Horizons Stewardship. Last month Don Smith with Horizons presented the results of the Feasibility Study, indicating we should be able to have success with this project. The Capital Campaign will have a kickoff meeting on May 20.   

    May 9, 2018 - We have a specially called Charge Conference Tuesday, May 15 at 7 pm to approve a resolution to begin the Capital Campaign with Horizons Stewardship.  Last month Don Smith with Horizons presented the results of the Feasibility Study, indicating we should be able to have success with this project.  If approved at the Charge Conference, the Capital Campaign will have a kickoff May 20.  All the leaders will be announced as well as their roles.  Please plan to attend on Tuesday.  


    Updates- April 2018

    April 30, 2018 - We have a called Charge Conference on Tuesday, May 15, at 7 pm.  The purpose of this meeting, which will be presided over by District Superintendent Rev. Kip Guilts, is to approve plans to begin a capital campaign with the purpose of fully funding the new Sanctuary.

    This Charge Conference will be one of two specially called Charge Conferences this year.  The purpose of both is to be as transparent and accountable as we can be.  The Administrative Council approved that we enter into a contract with Horizons Stewardship to do a Feasibility Study for the purpose of building a new Sanctuary.  We received the results of the Feasibility Study from Don Smith of Horizons on April 22, and we are moving forward.  We will present a proposal to the Charge Conference to begin a Capital Campaign at this Conference.  This is the purpose of the first Conference.

    The second called Charge Conference will be to approve the plans, cost and construction details of the proposed new Sanctuary.  Our building team is still meeting with the architect.  When they have completed their work we will have the second Charge Conference to approve building plans and cost for the new worship center.  No monies will be collected until we have voted our approval.  

    Should we receive approval on May 15, we will have a campaign kickoff May 20.  Team members and responsibilities will be announced at that time.  

    _____________________________

    April 24, 2018 - Don Smith, of Horizons Stewardship, joined us for the second service and led those who were interested and available through the results of the Feasibility Study.  We had abbreviated copies of the full report available, and the full report is available for check-out from me.   Approximately 71 people stayed behind to hear the results.

    The results were impressive.  Based on 16 in-person interviews done several weeks ago and 24 completed e-surveys, Don believed that we could raise between $350,000 and $500,000 at this point, and expects that estimate to increase as we know more details about the proposed new Sanctuary.  Afterwards, Don and I met with 17 families for 12 leadership positions in the capital campaign.  Everyone asked agreed to serve!  Glory to God!

    We'll have a kickoff event of the Capital Campaign and reveal the leaders and roles, the campaign name and theme, and much more on Sunday, May 20.  Please mark your calendar! 


    Updates- February 2018

    The Finance Committee voted to pay off our existing debt!  This was achieved by some memorial funds we have had for some time and from the proceeds of the sale of the land along  FM 2100. This is great news, and gives us a clean slate as we begin planning our Capital Campaign to build a new Sanctuary. - Pastor Frank

    ________________________________

    Rebuilding the Office Building Note from Brett McGregor, Trustees:

    The church office building work is split into 3 phases. 

    Phase 1 = New staff offices, dining, kitchen, janitor closet, bathrooms, west hall thru foyer

    Phase 2 = Choir room, Willing workers, Seekers, Pathfinders, 3rd-5th grade children, Youth director, East hall way full length

    Phase 3 = Childrens church 4yrs-2nd grade, Pre K / K class, Nursery, Nursery office, childrens director office.  This phase also includes demo'ing 2 walls in the original office areas to create the larger rooms for children's church and future mothers day out rooms.

    A joint Trustees/Building Team will be scheduled very soon. Purpose of the meeting will be to outline the vision for the Sanctuary that we will provide to the capital fund raising team and to the architect to start drafting up options for our review.

    ________________________________

    Capital Campaign Meeting and Vote (2/04/18)

    The Ad Council met for discussion and voted to hire Don Smith of Horizons Stewardship to help us with our capital campaign to build a new Sanctuary. Interested members and guests were invited to atted this discussion. (On January 30, a team spoke with Mr. Smith regarding what Horizons could bring to the table for our campaign and those members spoke at the Ad Council meeting as well.)

    ________________________________

    Moody Foundation Matching Grant from Pastor Frank (1/29/18)

    I am delighted to tell you I have officially been notified by the Permanent Endowment Fund of the Moody Foundation of  matching grant of up to $145,000. This grant offer is in place until January of 2019.  
      


    Update - January 30, 2018
    Dear friends, 

    I wanted to let you know where we are in our progress to Restore, Rebuild, Transform at Lake Houston UMC.   We have completed the majority of the work for the Christian Fellowship Center and we continue to have both of our worship services there.  Money for this came from our Rainy Day Fund and was enhanced by a gift from the Texas Annual Conference.  

    Repairs have begun in our office building.  As you may recall, we are moving the staff offices to the north end of the building, to create a wing devoted to Children's Ministry.  We plan to have a Mother's Day Out program here when repairs are complete,and perhaps one day a preschool.  The area is growing substantially, and we prayerfully want to meet that need for children to know the love of Jesus.  Monies for this project are coming from the selling/seizure of our property for the expansion of FM 2100.  The offices have been framed in, and we are awaiting electrical and phone work to be done.  

    Bathrooms have been framed in and we'll shortly have plumbers to come in.  The staff will be thrilled to have bathrooms in the building where we work!  

    We will be having a telephone conference with Don Smith of Horizons Stewardship on Tuesday night, to talk about what Horizons can bring to the table of a capital campaign to build a new Sanctuary.  We've been offered architectural services by Wesley Duncan.  Wesley  is associate pastor at Humble UMC, has a masters in architecture and is looking for hours to complete his license.  He's offered us his services for free, and he'll be under the supervision and guidance of a licensed architect.  

    The biggest and latest news is that we've been awarded a grant from the Permanent Endowment Fund of Moody Methodist Church!  We received official notification today that we've been awarded $145,000 in matching grants!  Thank you God, and thank you Moody, and thank you Bert!! 

    Upcoming plans are to have a church-wide meeting to vote on a capital campaign.  

    Thank you for your ongoing prayers, gifts and encouragement.  I have included several of our church leaders on this email.

    Blessings and peace,

    Frank Coats


    Trustees / Building Committee Joint meeting October 12, 2017  - Minutes    

    Agenda

    Water Well Update

    Recap/update on plan forward agreed at Sept 28 meeting

    Approve bids for sheetrock, vinyl tile, paint in CFC – Trustees

    Approve bids for CFC concrete grinding, staining, sealing – Trustees

    Name a decorating sub-committee (for tile, paint and stain color selection) – Building committee Review Floor plan for staff offices and childrens wing – both committees          

    Attendees: Linda Davis, Fred Baker, Wanda Baker, Tara Harris, Andrew Harris, Chris Ludwig, Ann Williams, Tommie Whitaker, Doug Spitz, Harry Piercy, Cassandra McGregor, Jesse Soto, Derek Thibodeaux, Christen Thibodeaux, Henry Schmidt, Ken Burns, Brett McGregor

    Water Well

    Tara Harris arranged to have the well tested for possible contamination from flood waters.  If the flood water was higher than the well head there is a risk that contaminated materials would flow down into the well.  Tara contacted a water quality specialist and had the water tested.  The results were negative for E coli but positive for coliform.   Signs were placed at each water faucet warning not to use.   The water quality specialist bleached the well to disinfect and then flushed the system.  We are awaiting follow up sample results.    The testing was all conducted free of charge. 

    Recap from Sept 28

    The committees agreed to focus on restoring the CFC and church offices/classrooms while developing details to rebuild a larger sanctuary to accommodate at least 250 people.  This will require a capital fund raising campaign and will likely take 6 months to assess feasibility.  This would leave the sanctuary unrepaired during the fund raising/assessment period.                 

    A motion was made and seconded for the plan below.  The joint committee voted unanimously to approve this plan.   

    1. Proceed with basic restoration of CFC sheetrock, flooring and paint - fund via rainy day account - ASAP
    2. Restore staff offices / bathrooms - as funds are avail from FM2100 frontage sale (contract signed/awaiting closing schedule, likely 30-60days)
    3. Restore offices/classrooms
    4. Hire architect to design and cost estimate sanctuary rebuild to maximum practical foot print ~4000 sf
    5. Leave Sanctuary as is for now
    6. Develop capital campaign…evaluate status in 6 mos or when goal reached
    7. Move pews and other items stored in the CFC classrooms to the sanctuary so rooms can be used for 3 Sunday school rooms         

    The details of the plan will be communicated to the congregation during service and via email to give the congregation an opportunity to provide feed back on the recommended path forward.

     

    CFC sheetrock, paint and classroom vinyl tile

    We only got 2 bids….the other 5 companies contacted didn’t want the work or didn’t call back. Brett recommended Moxhouse.  The price is right and they’ve been professional and responsive to work with.   They also will handle all 3 services so less of a hassle to work with.  

    Trustees voted Unanimously to award contract to Moxhouse Construction.

     

    CFC FLOORING BIDS

    Comments

    Texas concrete bid the SF I provided….which was high by ~800 sf….they were least professional, they made proposal without job site visit.

    Viking Floors recommended grind, stain, top coat of urethane for durability, very knowledgeable but …BBB F rating !  As a result the team chose not to consider their proposal.

    On follow up Refine recommend top coat of urethane as best choice for church/CFC application.

    Received revised quote from Cement Shine for Urethane top coat and cutting seams/polyuria fill. 

    The committees chose to grind, stain and go with the urethane top coat option because it will be much lower maintenance and is more durable than the standard epoxy top coats.

    Trustees voted Unanimously  to award contract to Refine Concrete to grind, stain and urethane top coat.

    Note: we will need change our chair dragging routine and gagga ball court set up to prevent damage.

    Decorating sub committee

    Christen, Linda and Cass volunteered to review and select paint and flooring colors.

    Floor plan for staff offices and childrens wing

    The joint committee then reviewed a plan to re-arrange the office building to locate the  staff offices in the north west wing and a childrens area (nursery, childrens church, future mothers day out) in the east wing.  Christen explained the plan and noted that she had met with Frank, Ann and Cathy the previous week to get their input.  The church staff supported the plan. 

    Joint committee voted Unanimously to approve the proposed building revisions.


    See Article - Chron.com, September 29, 2017
    "Huffman church rebuilds after Harvey"
    http://www.chron.com/neighborhood/lakehouston/news/article/Huffman-church-rebuilds-after-Harvey-12240830.php


    Trustees / Building Committee Joint meeting September 28, 2017  - Minutes

    Agenda

    1. Restoration priorities (CFC, new staff offices, offices/classrooms, Sanctuary)    
    2. Making CFC functional again – sheetrock/paint/flooring (VCT in classroom, grind/stain/urethane main room             
    3. Growth/improvement options             

    Option 1:  Expand the Sanctuary ~$400K               

    Option 2:  Upgrade the CFC to worship center while maintaining as gym/multiuse facility   ~$50K

    Option 3:  Build a gym and upgrade the CFC to worship center     ~$250K              

    Attendees: Linda Davis, Fred Baker, Tara Harris, Andrew Harris, Chris Ludwig, Frank Coats, Ann Williams, Jim Stanley, Tommie Whitaker, Doug Spitz, Harry Piercy, Cassandra McGregor, Jesse Soto, Derek Thibodeaux, Brett McGregor

    Committees reviewed the proposed designs of each option and budgetary cost estimates for each.  The committees performed a PRO/CON analysis for each and debated best overall path for our church.  

    The committees agreed to focus on restoring the CFC and church offices/classrooms while developing details to rebuild a larger sanctuary to accommodate at least 250 people.  This will require a capital fund raising campaign and will likely take 6 months to assess feasibility.  This would leave the sanctuary unrepaired during the fund raising/assessment period.                  

    A motion was made and seconded for the plan below.  The joint committee voted unanimously to approve this plan.           

    1. Proceed with basic restoration of CFC sheetrock, flooring and paint - fund via rainy day account - ASAP
    2. Restore staff offices / bathrooms - as funds are avail from FM2100 frontage sale (contract signed/awaiting closing schedule, likely 30-60days)
    3. Restore offices/classrooms
    4. Hire architect to design and cost estimate sanctuary rebuild to maximum practical foot print ~4000 sf
    5. Leave Sanctuary as is for now
    6. Develop capital campaign…evaluate status in 6 mos or when goal reached
    7. Move pews and other items stored in the CFC classrooms to the sanctuary so rooms can be used for 3 Sunday school rooms            

    The details of the plan will be communicated to the congregation during service and via email to give the congregation an opportunity to provide feed back on the recommended path forward.   


    TRUSTEES UPDATE @ service on Sunday, September 22, 2017 

    Four weeks ago the rain fell and the water rose.  So much has been accomplished since then and I can tell that I have never been more proud to be a member of LHUMC.

    For those whose homes flooded you have my sincere thoughts and prayers for the restoration of your homes.  There are few circumstances more disruptive than the loss or serious damage to ones home.  My prayers are with you.

    For our church, you’ve now seen the pictures.

    Sanctuary and offices took 3-4”

    CFC just an inch which was enough to damage the drywall and flooring.  The rooms to the west (RR,Foyer, Kitchen)  were less impacted.  The floor drains kept the water below the drywall.

    Yesterday we completed the demolition of everything we believe was impacted by flood waters.  We’re treated the exposed stud walls and flooring with antifungal several times.

    Right after the storm we asked ServPro for a bid for the demolition and clean up.  They quoted $94K.  Well we don’t have $94K but we have spirit and a congregation that was willing to roll up their sleeves and do this difficult and dirty work.

    We had 20-30 church members working each Saturday and 60 volunteers from a church in college station on the second Saturday who helped to demo and clean up.

    The carpet and glue in the CFC were especially tough.  We had a ATV in here to pull up carpeting and we rented 4 different machines to remove the glue.  We also had about 30 people on hands and knees with razor scrapers to get this floor down to bare concrete.

    So at this point we have completed the demolition and clean up phase.  We are blessed to be inside with a roof over our head and air conditioning today worshiping our heavenly father.   AMEN

    Whats next? We are considering many options about how to rebuild and no final decisions have been made.  We need your physical, spiritual and financial help.

    The preliminary estimate just to restore the buildings is $150K.  We are gettings bids from multiple contractors for drywall, flooring and paint and expect to have a final cost estimate in the next 2 weeks.

    We have two committees that will work jointly to confirm our path forward. The Trustees and the recently chartered Building committee. 

    For the near term our focus will be to restore the CFC and get it into condition for regular use. We will continue to use the building throughout the repair process.  Next week we will resume the 830 and 1045 services.  Within the next 2 months I hope to have the CFC restored.

    We are considering 3 options

    • Simply restore what we have with only minor improvements
    • Expand the sanctuary to accommodate about 250. This would involve significant structural changes and moving 2 walls. Under this option we would  return the CFC to its original purpose of youth, athletics and special events
    • Improve the CFC to be a more intimate worship setting (lighting, flooring, stage, altar and perhaps some stained glass windows).  Under this option we’d just restore the sanctuary to its original chapel function.

    The Building and Trustees committee will work on these and other options and bring it back to the congregation for comment before any final decisions are made.

    All of this will take money….money we don’t currently have.  The FM2100 ROW land sale is $145….not enough to cover the simple restoration option.

    So again we’ll be asking for your physical, spiritual and financial support as we rebuild our buildings and strengthen our church family.

    Thank You,
    Brett McGregor
    On behalf of the Trustees


    FOR IMMEDIATE RELEASE:
    September 21, 2017

    Methodist Church Restoring Buildings, Mission, and Hope
    On August 29, 2017 the rains from Hurricane Harvey invaded Lake Houston United Methodist Church in Huffman, Texas, flooding the surrounding fields and filling the Sanctuary, the Christian Fellowship Center and all rooms and offices. Teams of volunteers swarmed even before the rains stopped, pulling sodden carpet, moving pews and chairs and trying to save what they could. No room, no wall, no floor was left untouched, and volunteers from around the state came to help by checking baseboards, cutting sheetrock, pulling insulation and crowbarring every floorboard from the Sanctuary, first built in 1962. All the demolition work has been done by members and volunteers, young and old, who continue to work tirelessly since the flood.

    The church faces extensive work ahead as it seeks to Restore, Rebuild and Transform the only Methodist Church in Huffman, Texas. Both worship centers are severely impacted and cannot be used at this time. The Revolution Youth group and children’s activities are being held at neighborhood churches. For now, only one worship service is being held outside in the parking lot at 9 a.m. on Sunday. Sunday school classes and Bible studies are beginning to meet in homes while the church office staff works cheerfully in extraordinary conditions.

    LHUMC has faithfully served the community through various local missions that have been forced to be on hold due to the damage sustained to the buildings. One of the missions affected is MISSION:SERVE in which the youth group was about to reach a milestone this month of preparing and donating the 7,000th lunch for the Huffman Food Pantry. The Pantry has given them out to those in need each week for the last two years. Another important mission that was impacted is Family Promise – a program that helps communities address the challenge of family homelessness. LHUMC provides a place for where families can take showers, receive case management and look for housing and jobs. LHUMC volunteers give their time in making meals and sharing hospitality with our guests, share food, spend the night, play with children and lend their passion and expertise to help families get back on their feet. In addition, the Lake Houston group of Alcoholic Anonymous and the Bible Study Fellowship groups will have to be temporarily relocated.

    The fall is a time that Lake Houston UMC really shines as it holds its Annual Fall Festival attracting many to the church grounds for fun children’s activities, vendor booths, silent auction and more. This event had to be cancelled this year since the church buildings were damaged and unable to accommodate the public. On one bright note, the church is happy to announce that one 16-year church tradition will continue in October. The giant Pumpkin Patch is scheduled to open October 9th through October 31st. Proceeds from the Pumpkin Patch usually benefit missions outside of the church. This year, proceeds from pumpkin sales will go toward restoring church property. Unfortunately, there was no flood insurance on the buildings, and Lake Houston UMC are facing enormous costs for restoration. The church theme for worship service and fundraising campaign is “Restore, Rebuild and Transform” both their members as well as their buildings. Prayers and financial assistance are being requested for the church to continue restoration and there are several ways to support the church. More information is available at www.lakehoustonumc.com


    Article about LHUMC in "Cross Connection" - Sept 14, 2017 edition
    "Healing From Harvey"
    http://www.txcumc.org/newsdetail/healing-from-harvey-9332416